The project connected two new gas wells to the existing Xyris production facility via two new flowlines and a new trunkline.

The Xyris low temperature separation processing facility (previously in care and maintenance) was modified and upgraded with a new gas to gas heat exchanger, new power generation plant and control systems and all remaining equipment was brought back up to operational status. This enabled on-spec gas to be exported to the Parmelia Gas Pipeline.

The Project was completed safely, under the client’s budget and against extremely tight schedule demands. Net sales gas capacity – 10Tj/d.

 

Project facts

SCOPE

  • 2 x Well pads
  • 2 x Flowlines (AS 2885 pipelines)
  • 6.5km DN150 Trunkline (AS 2885 pipeline)
  • Pipeline facilities
  • LTS gas processing facilities

CLIENT

  • AWE Limited

LOCATION

  • 14.5 kilometres east of Dongara and 367km north of Perth, Western Australia

DATES

  • May 2015 to Aug 2016

ROLES & SERVICES

  • Concept and FEED: Engaged by AWE to develop the concept engineering package and complete the front-end engineering and design. Subsequently engaged to deliver project execution planning, contract and procurement packages, cost estimate and schedule sufficient to support project FID
  • EPCM: Engaged by AWE as the EPCM contractor for delivery of the project
  • Commissioning: Engaged by AWE to perform commissioning and assist with handover to operations

KEY CHALLENGES

  • Reinstatement and commissioning of mothballed plant and equipment

MAJOR ACHIEVMENTS

  • Completion of the project achieving AWE’s “5 Green Lights” for safety, environmental compliance, budget, schedule and performance