The Mondarra Storage Facility (MSF) Project involved the delivery of a gas reservoir storage facility capable of injecting gas at a rate of 70TJ/day and withdrawal of up to 150TJ/day as required.
The facility, owned and operated by APA Group, includes the Mondarra reservoir, Wellhead equipment and flowlines, DBNGP and Parmelia pipeline inlet/outlet facilities and flowlines and gas conditioning equipment.
The facility was the first of its kind in WA and provides the South-West of WA with additional gas resources and energy security. Enscope was contracted to provide EPCM and commissioning services from project development through to operations handover.