Waitsia Gas Project

AWE Limited

AWE’s Waitsia Gas Project Stage 1A connected two new gas wells to the existing Xyris production facility via two new flowlines and a new trunkline. The Xyris low temperature separation processing facility (previously in care and maintenance) was modified and upgraded with some new equipment to suit the new operational requirements, enabling on spec gas to be exported to the Parmelia Gas Pipeline.

Our Support

FEED: Engaged by AWE to complete the front-end engineering, project execution planning, contract and procurement packages, cost estimate and schedule sufficient to support project FID.

EPCM: Engaged by AWE as the EPCM contractor for delivery of the project.

Commissioning: Engaged by AWE to perform commissioning and assist with handover to operations.

Project Summary

2 x Well pads
2 x Flowlines (AS 2885 pipelines)
6.5km DN150 Trunkline (AS 2885 pipeline)
Pipeline facilities
LTS gas processing facilities

Project value $17.5m
Completion date August 2016
Net sales gas capacity 10 TJ/d